Milmar Food Group - Goshen, NY
Overview
Accurate Refrigeration Design removed a concrete freezer floor in Milmar Foods Group, when the facility was shut down for Jewish Passover.
We had 9 days to remove and install brand-new freezer floor. The existing freezer floor had been installed incorrectly and was raising the concrete slab in freezer. Due to the existing condensation, the evaporation system they had failed.
Accurate Refrigeration Design removed the existing concrete flooring, as shown in the pictures and designed and installed a new floor with a system that was designed for this type of blast freezer. We installed stainless steel curbs and helped reduce the ice problems by fixing existing panels that were leaking.
This particular job consisted of 3 crews, running 24hours a day to complete. We also made the dead line in the time given for Passover holiday.
View Floor Plan.